حامدي مريم-450220 ، طحان اصغر ، ديواني پور عبدا.. |
Developing an Optimization Model for Determining the Preventive Maintenance Period for Critical Machineries using FMEA and ANP |
International Journal of Engineering and Technical Research |
3 |
1-6 |
2015 |
ديواني پور عبداله ، كاظمي مرتضي ، طحان اصغر |
Decision support system designed to optimize maintenance and operation processes in petrochemical industry based On Markov Decision Approach |
International Journal of Engineering and Technical Research |
3 |
15-19 |
2015 |
مرجان شيراني |
Providing a Model to Evaluate the Effective Management of Risks in the Sustainable Management of the Project |
Arth Prabhand: A Journal of Economics and Management |
4 |
1-13 |
2015 |
ميري ميثم |
Evaluation of the Relative Efficiency of Agent Banks in Upgrading of Rural Housing Scheme by Using Data Envelopment Analysis (Case Study: Agent Banks in Lorestan Province, Iran) |
Asian journal of research in banking and finance |
5 |
13-24 |
2015 |
عباسي گراوند ايوب |
Development of an imperialist competitive algorithm (ICA)-based committee machine to predict bit penetration rate in oil wells of Iran |
CIENCIA E NATURA |
37 |
173-182 |
2015 |
شعباني نژاد بهزاد ، فكري ركسانا-416272 |
Evaluating the effectiveness of System Engineering on Organization Management Using Structural Equations Modeling |
CIENCIA E NATURA |
37 |
130-140 |
2015 |
شعباني نژاد بهزاد ، فكري ركسانا-416272 |
Evaluating the effectiveness of System Engineering on Organization Management Using Structural Equations Modeling |
CIENCIA E NATURA |
37 |
130-140 |
2015 |
حامدي مريم-450220 ، نريماني سميه |
Exploring the Relationship between Total Productive Maintenance (TPM), Customer Relationship Management (CRM) and Agile Manufacture (AM) |
Applied mathematics in Engineering, Management and Technolog |
1 |
432-440 |
2014 |
Ismail N |
Developing Capability -Based Virtual Cellular Manufacturing Systems and Comparison with Capability -Based Classical Cellular Manufacturing Systems |
Applied Mechanics and Materials |
110 |
3938-3946 |
2012 |
Ismail N ، Ariffin M. K. A. |
Virtual cellular manufacturing system based on resource element approach and analyzing its performance over different basic layouts |
international journal of industrial engineering computations |
3 |
265-276 |
2012 |
حامدي مريم ، Ismail N ، Ariffin M.K.A. |
Capability-based virtual cellular manufacturing systems formation in dual-resource constrained settings using Tabu Search |
COMPUTERS & INDUSTRIAL ENGINEERING |
62 |
953-971 |
2012 |
Ismail N ، Arefin M. K. A. |
Developing a Method to Generate Semi Distributed Layout by Genetic Algorithm. |
INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH |
50 |
1-23 |
2011 |
Sulaiman S ، Ariffin M.K.A. ، Faghihi K. ، Baharudin B.T.H.T. |
Customer Knowledge Management Application in Malaysian Mobile Service Providers |
Advanced in Control Engineering and Information Science |
15 |
3891-3895 |
2011 |
Sulaiman S ، S Hong Tang ، Pawanchi S ، Ariffin M.K.A. ، Baharudin B.T.H.T. |
Improvement of Tops Spinning Manufacturing with CNC Lathe |
Advanced in Control Engineering and Information Science |
15 |
3886-3890 |
2011 |
Sulaiman Shamsuddin ، Ismail N ، Megat Mohammad Hamdan Megat Ahmad Megat Ahmad |
A tabu search approach for mixed-model parallel assembly line balancing problem (type II) |
International Journal of Industrial and Systems Engineering |
8 |
407-431 |
2011 |
حامدي مريم-450220 ، Zanjirani Farahani Reza ، Husseini Mohammad Moattar |
A distribution planning model for natural gas supply chain: A case |
ENERGY POLICY |
37 |
799-812 |
2009 |